Why we expand pathways
You can walk or cycle to more places in Wrenford every year. The City is building and improving pathways to give you safe, connected routes between neighbourhoods, parks, and key destinations like schools and transit stops. These projects cut traffic, lower emissions, and make it easier for people of all ages and abilities to get around.
Our work follows the Official Plan and the Accessibility guidelines. We focus on creating a network that links the Tamsin River Trail System with local parks, commercial areas, and residential streets. Every new section is designed to meet the standards in the Accessibility for Ontarians with Disabilities Act, 2005 (AODA), so routes are smooth, well-lit, and wide enough for wheelchairs and strollers.
Current pathway projects
Corvid Creek Ravine Pathway Extension
Status: Under construction (Expected completion: Spring 2027)
This project adds a new paved pathway along the west bank of Corvid Creek. It will connect the Riverside Flats Park trailhead directly to the Benchlands Lookout Park network. The route includes gentle ramps, new lighting, and widened sections where it crosses local roads. Construction runs from 7:00 a.m. to 6:00 p.m., Monday to Friday. You can still use the existing dirt trail, but expect temporary detours near the creek. The City will post weekly updates on the News & Events page.
Ambrel Lake Loop Expansion
Status: Planning phase (Public consultation open until November 2026)
The current loop around Ambrel Lake Park is popular but gets crowded during peak hours. The expansion will add a second loop on the north shore, linking the boardwalk to the Ambrel Lake Recreation Centre and the Wrenford Public Library — Ambrel Lake Branch. The design prioritizes separated bike lanes and accessible boardwalk sections. Feedback forms are available at City Hall and online. We want to hear how you use the area now so we can build what you actually need.
Wildrye Connector Pathway
Status: Future phase (Scheduled for 2028)
As the Wildrye neighbourhood continues to grow, the City is planning a pathway that connects the new residential streets to Corvid Way and the main trail system. This route will include new bridges over local drainage ditches, playground stops every two blocks, and secure bike parking near the future community hub. Early planning is already underway, and engineers are mapping the most direct route to the existing Tamsin River Trail System.
Pathway rules and seasonal care
You can help keep pathways safe and well-maintained. The Parks team clears leaves in the fall and snow from main routes in the winter, but it is your job to report hazards right away. If you see a crack, a fallen branch, or a missing light, report it online or call 311. When you are out on the trails, please follow the trail rules so everyone can enjoy the space. Keep dogs on a two-metre leash unless you are in a designated off-leash area, and watch for pedestrians when you are cycling.
Want to suggest a new route or share feedback on a project? Email the Pathways Coordinator at [email protected] or call 519-555-0140. We hold open houses before breaking ground, so watch the News & Events calendar for updates.